﻿{"id":10527,"date":"2019-05-31T08:24:00","date_gmt":"2019-05-31T08:24:00","guid":{"rendered":"http:\/\/172.16.1.131:9099\/?p=10527"},"modified":"2025-04-22T05:04:54","modified_gmt":"2025-04-22T05:04:54","slug":"inspection-to-thu-kha-takhun-company-limited-mm","status":"publish","type":"post","link":"\/my\/10527\/","title":{"rendered":"\u101e\u102f\u1001\u1010\u1036\u1001\u103d\u1014\u103a \u1000\u102f\u1019\u1039\u1015\u100f\u102e\u101c\u102d\u1019\u102d\u1010\u1000\u103a \u101e\u102d\u102f\u1037 \u1000\u103d\u1004\u103a\u1038\u1006\u1004\u103a\u1038\u1005\u1005\u103a\u1006\u1031\u1038\u1001\u103c\u1004\u103a\u1038"},"content":{"rendered":"\n<figure class=\"wp-block-image alignfull size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"575\" src=\"\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_1-1024x575.jpg\" alt=\"\" class=\"wp-image-41276\" srcset=\"https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_1-1024x575.jpg 1024w, https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_1-300x169.jpg 300w, https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_1-150x84.jpg 150w, https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_1-768x432.jpg 768w, https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_1.jpg 1253w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-justify\" style=\"margin-top:var(--wp--preset--spacing--40);margin-right:var(--wp--preset--spacing--80);margin-bottom:var(--wp--preset--spacing--40);margin-left:var(--wp--preset--spacing--80)\">An inspection team consists of the officials from the Directorate of Investment and Company Administration, the Environmental Conservation Department, the Electric Supply Enterprise, the Department of Labor and the Directorate of Industrial Supervision and Inspection Conducted field inspection on works carrying out under SRIC Endorsement by\u00a0<strong>\u201cThu Kha Takhun Company Limited\u201d<\/strong>\u00a0at Holding No. (72\/2, 72\/3), Kwin No. 2026 (A Ye Myauk Kwin), Tamar Myaing Quarter, Chaung Oo Township, Monywa District, Sagaing Region on 29th May, 2019. The team discussed and coordinated the needs of the company.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" loading=\"lazy\" width=\"576\" height=\"386\" src=\"\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_2.jpg\" alt=\"\" class=\"wp-image-41277\" srcset=\"https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_2.jpg 576w, https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_2-300x201.jpg 300w, https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2025\/04\/thun_kha_takhun_2-150x101.jpg 150w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>An inspection team consists of the officials from the Directorate of Investment and Company Administration, the Environmental Conservation Department, the Electric Supply Enterprise, the Department of Labor and the Directorate of Industrial Supervision and Inspection Conducted field inspection on works carrying out under SRIC Endorsement by\u00a0\u201cThu Kha Takhun Company Limited\u201d\u00a0at Holding No. (72\/2, 72\/3), Kwin No. 2026 (A Ye Myauk Kwin), Tamar Myaing Quarter, Chaung Oo Township, Monywa District, Sagaing Region on 29th May, 2019. The team discussed and coordinated the needs of the company.<\/p>\n","protected":false},"author":3,"featured_media":30,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_editorskit_title_hidden":false,"_editorskit_reading_time":0,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","_en_post_content":"","_en_post_name":"","_en_post_excerpt":"","_en_post_title":"","_my_post_content":"","_my_post_name":"","_my_post_excerpt":"","_my_post_title":"","edit_language":"","footnotes":""},"categories":[107,75],"tags":[],"blocksy_meta":{"has_hero_section":"enabled","hero_section":"type-2","page_title_bg_type":"color","styles_descriptor":{"styles":{"desktop":"[data-prefix=\"single_blog_post\"] .entry-header .page-title {--fontSize:30px;} [data-prefix=\"single_blog_post\"] .entry-header .entry-meta {--fontWeight:600;--textTransform:uppercase;--fontSize:12px;--lineHeight:1.3;} [data-prefix=\"single_blog_post\"] .hero-section[data-type=\"type-2\"] {background-color:var(--paletteColor6);background-image:none;--container-padding:50px 0;}","tablet":"","mobile":""},"google_fonts":{"Poppins":["n3","n6"]},"version":5}},"featured_image_urls":{"full":["https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2023\/06\/dica-logo-1.png",630,526,false],"thumbnail":["https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2023\/06\/dica-logo-1.png",150,125,false],"medium":["https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2023\/06\/dica-logo-1.png",300,250,false],"medium_large":["https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2023\/06\/dica-logo-1.png",630,526,false],"large":["https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2023\/06\/dica-logo-1.png",630,526,false],"1536x1536":["https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2023\/06\/dica-logo-1.png",630,526,false],"2048x2048":["https:\/\/www.dica.gov.mm\/wp-content\/uploads\/2023\/06\/dica-logo-1.png",630,526,false]},"post_excerpt_stackable":"<p>An inspection team consists of the officials from the Directorate of Investment and Company Administration, the Environmental Conservation Department, the Electric Supply Enterprise, the Department of Labor and the Directorate of Industrial Supervision and Inspection Conducted field inspection on works carrying out under SRIC Endorsement by\u00a0\u201cThu Kha Takhun Company Limited\u201d\u00a0at Holding No. (72\/2, 72\/3), Kwin No. 2026 (A Ye Myauk Kwin), Tamar Myaing Quarter, Chaung Oo Township, Monywa District, Sagaing Region on 29th May, 2019. The team discussed and coordinated the needs of the company.<\/p>\n","category_list":"<a href=\"\/my\/category\/field-inspections-my\/\" rel=\"category tag\">\u1019\u103c\u1031\u1015\u103c\u1004\u103a\u1021\u1001\u103c\u1031\u1021\u1014\u1031\u101c\u1031\u1037\u101c\u102c\u1001\u103c\u1004\u103a\u1038\u1019\u103b\u102c\u1038<\/a>, <a href=\"\/my\/category\/news-and-stories-my\/\" rel=\"category tag\">\u101e\u1010\u1004\u103a\u1038\u1019\u103b\u102c\u1038<\/a>","author_info":{"name":"adminIT","url":"\/my\/author\/adminit\/"},"comments_num":"0 comments","_links":{"self":[{"href":"\/my\/wp-json\/wp\/v2\/posts\/10527"}],"collection":[{"href":"\/my\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"\/my\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"\/my\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"\/my\/wp-json\/wp\/v2\/comments?post=10527"}],"version-history":[{"count":2,"href":"\/my\/wp-json\/wp\/v2\/posts\/10527\/revisions"}],"predecessor-version":[{"id":41278,"href":"\/my\/wp-json\/wp\/v2\/posts\/10527\/revisions\/41278"}],"wp:featuredmedia":[{"embeddable":true,"href":"\/my\/wp-json\/wp\/v2\/media\/30"}],"wp:attachment":[{"href":"\/my\/wp-json\/wp\/v2\/media?parent=10527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"\/my\/wp-json\/wp\/v2\/categories?post=10527"},{"taxonomy":"post_tag","embeddable":true,"href":"\/my\/wp-json\/wp\/v2\/tags?post=10527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}